No
Project Description
Client Year Contract Duration
1 Front End Engineering Design (FEED) and (EPCIC) of Three (3) Remote Wellhead Platforms (WHPS) for the North Malay Basin Field Development (New Crane Model : K55-100) ) Sapura Kencana Petroleum 2015
3.83 Months
2 PROVISION OF CRANE MAINTENANCE SERVICES (Tender No.: HESS/2014/139) Hess Exploration & Production Malaysia B.V
2015
3+1
Years
3 New Upgraded Crane for Guntong A (PO#4501059536) (New Crane Model : R450-100) ) EMEPMI 2015
3.75 Months
4 EPCC for BNJT-K & TTJT-A Wellhead Platform (WHP) Project (Pedestal Crane for BNJT-K) (New Crane Model : R450-90) Sapura Kencana Petroleum
2015
11 Months
5 Provision of Offshore Crane Maintenance And Repair Services (Contract No.: 153229) Talisman 2015
2+1 Months
No
Project Description
Client Year Contract Duration
1 Provision of Hydraulic Workover Unit (HWU) Rig For PCSB’S Workover Programme (Contract No.: CHO/2013/DDR/005) Provision of Portable Platform Crane (Subcontract No.: UMWOG/SC/UPD/PPC/0015) UMW Petrodril (M) Sdn Bhd 2014
2 Years
2 PHE ONWJ NEW PLATFORM (YY PLATFORM) (New Crane Model : K30-40) PT. Guna Tesuma Int.
2014
9.5 Months
3 Design, Supply and Delivery of Pedestal Crane for E6 Field Development Project (Tender#MY120000236) (New Crane Model : R550-90) Sarawak Shell Berhad 2014
13 Months
4 The Provision Of Engineering, Procurement And Construction Of Pedestal Crane For Marine Marginal Production Unit (MaMPU) Project (New Crane Model : K35-70) MISC Berhad
2014
6.5 Months
5 Front End Engineering Design (FEED) and Engineering, Procurement, Construction, Installation and Commissioning (EPCIC) of Three (3) Remote Wellhead Platforms (WHPS) for the North Malay Basin Field Development (New Crane Model : K55-90) Hyundai Heavy Industries
2014
11.5 Months
6 New Upgraded Crane for Tapis P (PO#4501072853) (New Crane Model : R450-100) EMEPMI 2014
3.75 Months
7 New Upgraded Crane for Tapis C (PO#4501059536) (New Crane Model : R450-100) EMEPMI 2014
3.75 Months
8 New Upgraded Crane for Jerneh A (PO#4501059537) (New Crane Model : R550-130) ) EMEPMI 2014
3.75 Months
No
Project Description
Client Year Contract Duration
1 Pre-Development and Development Works for the Balai Cluster Fields BC Petroleum
2013
1 month
No
Project Description
Client Year Contract Duration
1 Refurbishment of,One (1) Unit Of Pedestal Crane (Seaking,SK2300) at ERB WEST GAS “ A Platform PCSB-SBO PCSB-SBO 2012
6 Months
2 Provision,of Supply Pedestal Crane PT. Pertamina Hulu Energy West Madura Offshore PCSB-SBO
2012
6.25 Months
3 Refurbishment of,Pedestal Crane for West Desaru MOPU EPCIC Petrofac E&C Sdn.Bhd 2012 3.7 Months
4 Serendah,Oil & Gas Development Project (Pedestal Crane) Kencana Petroleum 2012 8.5 Months
5 Serendah,Oil & Gas Development Project (Pedestal Crane) Kencana Petroleum
2012 10 Months
6 EPS KAMELIA-A,Wellhead Platform Pipelines (Pedestal Crane) Kencana Petroleum
2012 5.5 Months
7 Patricia Oil,Development Project Kencana Petroleum 2012 7 Months
8 Provision of,Integrated for EMEPMI & PCSB-PMO (A2325720 (EMEPMI) & PMO/2011/PME/081,(PCSB) EMEPMI,& PCSB-PMO 2012 2012-2017
9 Provision of,Maintenance Service for Seacrane Crane for 2 Years Primary Period with 1 Year,Extension Petrofec 2012 2012-2014
10 Provision,of Crane Long Term Service Agreement LTSA Carigali,HESS 2012 3 Years
11 Provision,of Crane Maintenance Services for Newfield’s Production Operations Newfield,Peninsula Malaysia Inc. 2012 2 Years
12 Refurbishment Crane-,Unit Mariner (Model:280-H) & Seahorse (Model:160) to API 2C Spec Megadrill Services,Limited 2012
13 Provision of Supply,Pedestal Crane for UL Field Development Project PT. Guna Tesuma Int. 2012 8 Months
No
Project Description
Client Year Contract Duration
1 Supply two (2) unit pedestal crane for Berantai & Project-X Offshore Malaysia Petrofac 2011
6 Months
2 Supply two (2) unit pedestal crane for Cendor Phase 2 Developtment Project Petrofac
2011
6.25 Months
No
Project Description
Client Year Contract Duration
1 Provision to Supply Offshore Pedestal Crane for PCSB East And Penisular Malaysia GAIT 1&2 HWU Rig PCSB 2010
3 Years
2 Provision of procurement & Construction for Topsites of PM329 East Piatu Dev . Project KHL/Newfield
2010
10 Months
3 Supply, Test, Install & Commission One(1) unit of refurbished Tower Mounted Crane for Pulai A, PCSB PMO PCSB 2010
5 Months
4 Provision for PM-3 CAA & PM 305 Crane Maintenance Services (contract extension) Talisman Malaysia Ltd
2010
2 Years
No
Project Description
Client Year Contract Duration
1 Provision for PM-3 CAA & PM 305 Crane Maintenance Services Talisman Malaysia Ltd 2007
3 Years
2 Provision to Supply Offshore Pedestal rental crane to support PCSB Domestic Work Over (DWO) Gait II PCSB
2007
3 Years
3 Eng, Procurement, Construction & Commissioning of CLQ Deck & Jacket, CFP & Tripod & Three Bridges (CPOC) Kencana HL/PCSB 2007
12 Months
4 15525 SSB F6Q-A & SSB F23Q-A LQ Modules & Helideck Brooke Dockyard/SSB
2007
6 Months
5 Eng, Design, Fabrication, Test, Commissioning and Installation of a new Pedestal Cranes for Tembungo-A PCSB 2007
12 Months
6 Eng, Design, Fabrication, Test, Commissioning and Installation of a new Pedestal Cranes for BJ Services BJ Services
2007
6 Months
No
Project Description
Client Year Contract Duration
1 Eng, Design, Fabrication, Test, Commissioning and Installation of 2 New Pedestal Cranes for F6 SSB 2006
6 Months
2 Eng, Design, Fabrication, Test, Commissioning and Installation of a new Pedestal Cranes for Tabu B EMEPMI
2006
6 Months
3 Eng, Design, Fabrication, Test, Commissioning and Installation of a new Pedestal Cranes for Chendor GPS/Petrofac 2006
6 Months
4 Eng, Design, Fabrication, Test, Commissioning and Installation of a new Pedestal Cranes for Petrofac Chendor MITCO/ MISC Petrofac
2006
6 Months
5 Eng, Design, Fabrication, Test, Commissioning and Installation of a new Pedestal Cranes for Sumandak PCSB/SDE 2006
6 Months
6 FCB 355 Integrated Crane maintenance and overhaul EMEPMI
2006
5 Years + 2 Years
6 PCSB P4/C5/P100 Integrated Crane Maintenance and Overhaul PCSB 2006
5 Years + 2 Years
7 Domestic Work Over (DWO) PCSB
2006
5 Years
No
Project Description
Client Year Contract Duration
1 Eng, Design, Fabrication, Test, Commissioning and Installation of PTB crane for South Angsi Talisman 2004
8 Months
2 Eng, Design, Fabrication, Test, Commissioning and Installation of 2 new Pedestal Cranes for F23 SSB
2004
6 Months
No
Project Description
Client Year Contract Duration
1 Provide rental crane for Pulai Platform PCSB 2003
12 Months
2 Eng, Design, Fabrication, Test, Commissioning and Installation of New Pedestal Crane for Duyung A PCSB
2003
5 Months
No
Project Description
Client Year Contract Duration
1 Rental of 2 Pedestal Crane for Tukau PCSB 2001
12 Months
2 Provide Pedestal Crane for IBA hose tie in Project Petra
2001
12 Months
No
Project Description
Client Year Contract Duration
1 FCB 336 Integrated Crane Maintenance and Overhaul EMEPMI 2000
3 Years + 2 Years
2 Pedestal Crane Rental Ecodrill
2000
2 Years
3 PCSB 289 Crane Maintenance and Overhaul PCSB
2000
3 Years + 2 Years
No
Project Description
Client Year Contract Duration
1 FCB 332 Crane Operator, Cargo handling and Signalman Training EMEPMI
1998
3 Years
No
Project Description
Client Year Contract Duration
1 FCB 317 Provide Lifting Services For TCOT ESSO TCOT
1997
3 Years
No
Project Description
Client Year Contract Duration
1 FCB 315 Integrated Crane Maintenance and Overhaul EMEPMI
1995
3 Years + 2 Years